Deck Beam Span Calculator & Post Spacing
This deck beam span calculator tells you which built-up beam to use, how many posts it needs and how far apart to set them. Enter how far your joists run and how long the beam is. It reads the IRC beam table for No. 2 southern pine, the treated lumber used on most Georgia decks.
Calculating…
How the beam span calculator works
On a typical attached deck, one end of every joist hangs from a ledger on the house and the other end sits on a beam. The beam is two or three 2× boards nailed or bolted together. Posts hold the beam up and footings hold the posts up. The “beam span” is the distance between posts, and it depends on two things:
- How much deck the beam carries. Longer joists mean more deck area on each foot of beam, so the beam must be stronger or the posts closer together.
- The beam itself. A deeper board (2×12 rather than 2×8) and more plies (3 rather than 2) let the posts sit farther apart.
The calculator rounds your joist span up to the next column of IRC 2021 Table R507.5(1), which is the conservative reading. Then it works out, for six common beams, how many posts you need to cover the beam length and the actual post spacing. It recommends the option with the fewest posts, and the lighter beam when two tie.
Deck beam span table: southern pine
Maximum distance between posts for built-up No. 2 southern pine beams at 40 psf live load. Find your joist span across the top and read down.
| Beam | 6′ | 8′ | 10′ | 12′ | 14′ | 16′ | 18′ |
|---|---|---|---|---|---|---|---|
| 2-2×8 | 8′ 9″ | 7′ 7″ | 6′ 9″ | 6′ 2″ | 5′ 9″ | 5′ 4″ | 5′ 0″ |
| 2-2×10 | 10′ 4″ | 9′ 0″ | 8′ 0″ | 7′ 4″ | 6′ 9″ | 6′ 4″ | 6′ 0″ |
| 2-2×12 | 12′ 2″ | 10′ 7″ | 9′ 5″ | 8′ 7″ | 8′ 0″ | 7′ 5″ | 7′ 0″ |
| 3-2×8 | 10′ 11″ | 9′ 6″ | 8′ 6″ | 7′ 9″ | 7′ 2″ | 6′ 8″ | 6′ 4″ |
| 3-2×10 | 13′ 0″ | 11′ 2″ | 10′ 0″ | 9′ 2″ | 8′ 6″ | 7′ 11″ | 7′ 6″ |
| 3-2×12 | 15′ 3″ | 13′ 3″ | 11′ 10″ | 10′ 9″ | 10′ 0″ | 9′ 4″ | 8′ 10″ |
Single-ply beams and 2×6 beams are in the full table on the joist span calculator, alongside the joist spans that feed into this one.
Deck post spacing: what to aim for
Most decks in North Atlanta land somewhere between 6 and 10 feet between posts. Wider spacing means fewer holes to dig in red clay, fewer footings to inspect and a cleaner view from the yard. Tighter spacing lets you use a smaller beam. A few rules shape the layout:
- Beam overhang. The beam can run past the end posts, but the 2021 IRC limits that overhang to a quarter of the actual post spacing. The calculator flags an overhang that is too long.
- Splices over posts. A beam longer than one board splices on a post, never in mid-span. Stagger the plies so the joints don’t line up.
- Post size. We use 6×6 posts on decks we build. The IRC post table limits 4×4s to short heights, and a beam notched into the post needs a 6×6 at minimum. Tall posts on sloped lots also need bracing; ask your plan reviewer.
- Footing count. Every post needs a footing. Size them with the footing calculator once the post count is set.

Dropped beam or flush beam?
A dropped beam sits under the joists, which rest on top of it and are tied down with hurricane ties. A flush beam sits level with the joists, which hang from it in hangers. Flush beams give more headroom under a second-story deck and suit a screened porch below. The span tables apply to both, but the connections differ, so the framing plan should show which one you’re building.
When the table is not enough
The IRC beam table covers ordinary decks. A roof over the deck, a hot tub, joists over 18 feet or posts over 14 feet put you outside it, and you need an engineered design. See our guide to putting a hot tub on a deck for what changes.
Related guides
- Deck joist spacing: 12, 16 or 24 inches on center and what each means for the beam.
- Deck ledger board: the house side of the joist span.
- Deck flashing and joist tape: keeping water off the beam tops.
Verify with your permit office. These are planning values from the 2021 IRC, not an engineered design. Georgia adopts the IRC with state amendments, and your city or county may enforce a different edition. Roswell, Alpharetta and Fulton County review deck framing plans before issuing a permit.
Need the whole deck framed, not just the beam? Our deck design service draws the framing plan for the permit, and the deck material calculator turns it into a shopping list.
Deck beam span questions
How far can a double 2×10 beam span on a deck?
In No. 2 southern pine, a 2-ply 2×10 beam can span 9 ft 0 in. between posts when it carries 8-ft joists, 7 ft 4 in. with 12-ft joists and 6 ft 4 in. with 16-ft joists, per IRC 2021 Table R507.5(1).
How far apart should deck posts be?
It depends on the beam and the joist span, but most residential decks end up with posts 6 to 10 feet apart. A 3-ply 2×12 beam on 12-ft joists can reach about 10 ft 9 in.; a 2-ply 2×8 on the same joists only about 6 ft 2 in.
Is a 2-ply or 3-ply beam better?
A 3-ply beam spans farther, so it can save a post and a footing. It’s heavier and needs a wider post cap or a 6×6 notch. On long decks, the saved footings often pay for the extra lumber.
Can a deck beam overhang the post?
Yes. The 2021 IRC lets a beam cantilever past the end post by up to one quarter of the actual beam span. With posts 8 ft apart, the beam can overhang up to 2 ft.
Where should the deck beam be spliced?
Directly over a post. Splices between posts weaken the beam. Stagger the joints in each ply over different posts where you can, and follow the fastening schedule on your approved plans.
Stop staring at that tired old deck. Let’s draw something better.
Free in-home consultation. Honest material guidance. A clear, fixed-price quote you can take to the bank — usually within 48 hours of our visit.
Mon–Fri 7a–6p · Sat 8a–4p · Real local crews · No call centers