Deck removal looks like the easy part of a project, and mostly it is: boards, rails and joists come apart quickly. The work that matters is what’s left behind. A deck pulled off a house leaves holes in the siding, an exposed rim joist, concrete footings in the yard and a big pile of treated lumber. We take the deck down, haul it away and leave the house wall and the ground ready for whatever comes next.
Demo-only or demo and rebuild?
Most deck demolition jobs we see fall into one of two groups, and the scope is different for each.
Demo-only
You want the deck gone for good: it’s unsafe, you’re selling, you’re putting in a patio or you just don’t use it. Here the job includes everything needed to close the house back up: removing the ledger, repairing the wall behind it, dealing with the door that now opens onto a drop, and taking the footings out or down below grade so the yard can be graded and seeded. If a door now opens several feet above the ground, it needs a guard or a lock-out until something is built there.
Demo and rebuild
The old deck is coming off so a new one can go up. The demolition is part of a deck replacement, and the plan changes: we keep anything worth keeping (sometimes sound footings in the right spot), open the wall along the ledger line so the new ledger goes onto solid, flashed framing, and lay out new footings before the old ones are pulled. Doing demo and rebuild with one crew avoids paying twice to open and close the same wall.
Thinking about replacing the deck with something on the ground instead? Our deck vs patio guide compares cost, upkeep and how each works on a sloped North Atlanta lot.

From the first board to a closed-up wall.
A typical single-level deck comes down in a day or two. Height, access, a roof or screened porch on top, and how much wall repair is needed afterward set the real schedule.
Site visit & plan
We look at how the deck is attached, what’s underneath (utilities, AC units, hose bibs, dryer vents), where a trailer or dumpster can sit and how debris will travel from the backyard to the street.
Protect & disconnect
Plantings, windows and doors get protected. Any lights or outlets on the deck are made safe by an electrician before we cut. Gas lines or hot tub circuits get the same treatment.
Tear-off
Railings and boards first, then joists, beams and posts, working from the outside in and keeping the structure supported until the end. Nothing is dropped from height toward the house.
Footings & ledger
Footings are broken out or cut down below grade. The ledger comes off the house and we look at the rim joist and sheathing behind it.
Close up & clean up
Wall repaired and weather-tight, debris hauled, nails swept with a magnet, and the ground left rough-graded for your landscaper or the next build.
Haul-away, dumpsters and old treated lumber
A 300 sq ft deck is a lot more material than people expect once the framing and footings are counted. Debris either leaves on our trailer in loads or goes into a roll-off dumpster in the driveway. Trailers keep the driveway clear; a dumpster makes sense on bigger decks or when the rebuild follows straight on. If your HOA restricts dumpsters, we plan around that.
Old pressure-treated wood needs to go to proper disposal. Decks built before about 2004 were very likely framed with CCA-treated lumber, which contains arsenic compounds. It should never be burned in a fire pit or used for garden beds, and we don’t leave offcuts behind for that reason. Clean, untreated wood and metal hardware are separated where the disposal site allows it.
Footing removal: pull them or leave them?
Older North Fulton decks sit on anything from proper poured footings to a bag of concrete dumped around a post in the red clay. Removing them is often harder than removing the deck itself.
- Demo-only, lawn or planting going in: we break out the concrete or cut it down well below grade so it won’t surface or stop a shovel later.
- Patio going in: old footings under a new slab or pavers need to come out or be cut down so they don’t create hard spots that crack the surface.
- Rebuild: footings that are sized right, on firm native soil and in the right place may stay. Most don’t line up with a new design, so they come out.
Posts buried directly in the ground often snap off at grade when pulled, leaving rotted stubs in the hole. Those get dug out, not covered over.
Ledger and siding repair after a deck comes off
This is the part a lot of deck removal quotes skip. When the ledger comes off, you’re looking at the house’s rim joist, any sheathing, and siding that has been cut, nailed through or never installed behind the deck at all. On decks that were never flashed, there’s often rot in the rim joist or the bottom of the wall.
On a demo-only job we pull the ledger fasteners, replace rotted sheathing or rim sections where we find them (or tell you when the damage goes further than a deck contractor should handle), install house wrap and flashing as needed and patch or replace the siding to match as closely as we can. Brick and stone veneer walls are different; freestanding decks next to veneer usually leave less to repair. On a rebuild, the same wall section is opened so the new ledger goes on with proper flashing and membrane, and the ledger board guide explains how that connection should look.
What deck removal costs in North Atlanta
The typical 2026 range for demolition and haul-away in our area is roughly $5–10 per sq ft of deck. That’s a typical range, not a quote. For a 300 sq ft deck, that’s about $1,500–3,000 to take it down and haul it off.
What moves the deck removal cost
- Height: a second-story deck over a walkout basement takes staging and more care than a low ground-level deck.
- Access: steep backyards, narrow side yards and long carries to the street add labor. Much of North Fulton is built on slopes.
- Footings: large or deep concrete footings take time to break out and add weight to disposal.
- What’s on top: a roof, screened porch, pergola, built-in seating or a hot tub pad adds work and debris.
- Electrical and plumbing: lights, outlets, gas lines or spigots run through the deck need disconnecting by the right trade.
- Wall repair: siding, sheathing and rim joist repair are priced after the ledger comes off and we can see the damage.
- Permits: some cities want a demolition permit for an attached structure and some don’t. Check with your permit office; we confirm before starting.
For a rough number on your own deck, try the deck removal cost calculator. If a new deck is going up after, the deck cost calculator covers the build side.
We remove decks across Roswell, Alpharetta, Johns Creek, Milton, Sandy Springs, Dunwoody, Marietta, Woodstock and north Atlanta. Whoever you hire, make sure the quote says in writing what happens to the footings, the wall and the debris.
Related: repair-or-replace checklist · how long a deck lasts · deck repair
Questions about tearing down a deck.
How much does deck removal cost?
In North Atlanta, demolition and haul-away typically run roughly $5–10 per sq ft, so about $1,500–3,000 for a 300 sq ft deck. Height, access, big footings, a roof on top and wall repair after the ledger comes off push it higher. That’s a typical range, not a quote.
How long does it take to remove a deck?
A typical single-level deck comes down in a day or two. Tall decks, roofs, screened porches, heavy footings and siding repair can add several more days.
Do I need a permit to demolish a deck?
It varies by city. Some require a demolition permit for an attached structure and some don’t; if a new deck follows, the rebuild needs its own permit. Check with your permit office. We confirm the requirement before starting.
What happens to the house wall after a deck is removed?
The ledger comes off, leaving bolt holes and often missing or damaged siding. We repair rotted sheathing or rim joist where we find it, add flashing and house wrap and patch the siding so the wall is weather-tight.
Do the deck footings have to be removed?
For lawn, planting or a patio, yes, or at least cut well below grade. For a rebuild, sound footings in the right place can sometimes stay, but most don’t match a new layout.
Can I burn or reuse the old deck wood?
Don’t burn it. Treated lumber, especially older CCA-treated wood from decks built before about 2004, releases harmful compounds when burned and shouldn’t go in vegetable beds either. It should go to proper disposal.
Stop staring at that tired old deck. Let’s draw something better.
Free in-home consultation. Honest material guidance. A clear, fixed-price quote you can take to the bank — usually within 48 hours of our visit.
Mon–Fri 7a–6p · Sat 8a–4p · Real local crews · No call centers